UPDATES
OF MANUALS AND CORRECTIONS
|
1. |
INDEX OF ADVANCE
CORRECTION SLIPS OF INDIAN RAILWAYS
PERMANENT WAY MANUAL (IRPWM) - 1986 |
|
ACS
No. |
Para(s)
affected |
File
No. |
Date
of AC slip |
Brief subject. |
|
1. |
909 |
|
18.9.89 |
Traffic & Engineering
gates |
|
2. |
275 |
|
08.6.90 |
Provision
of Guard Rails on Bridges |
|
3. |
238 |
No.90/CE-II
/ MT-TS/4 |
16.4.90 |
Deep
screening of Ballast. |
|
4. |
Para.1.2,1.6
at page 1 of Ann.M/2 and para 4.2.1 at page
5 & para 5.6.3 at page 9 of Ann. M/2 |
No.91/CE-II/Misc./
6
No.91/CE-II/Misc./
6 |
02.8.91&
22.7.93 |
1.2 Length of CWR
1.6 Removal of Buffar Rails
4.2.1 LWR /CWR
5.6.3 SEJ or Buffer Rails |
|
5. |
LWR |
No.CT/
IM / LWR issued from RDSO,LKO |
12.9.91 |
-do- |
|
6. |
115
& 124(d) |
No.91/CE-II/Misc./
6
Routine Inspection of Track |
23.12.92 |
Inspection of office and
Stores |
|
7. |
259 |
No.91/CE-II/Misc./
6 |
28.8.94 |
Combination
of Fish Plates. |
|
8. |
410(2) |
No.91/CE-II/Misc./
6 |
28.8.94 |
Speed
over Turnout curves. |
|
9. |
124
&
139 |
No.93/CE-II/TSC
/ 1 |
14.3.92 |
Inspection
of Track
Inspection of Track |
|
10. |
224
316
403 |
94
/CE-II/TSC / 1 |
20.6.96 |
224
Regular Track Maintenance.
316 Track laying standards.
403 Gauge on Track |
|
11. |
914(b)
(i) |
No.94/CE-II/TSC
/ 1 |
21.8.96 |
Maintenance
of level crossing |
|
12. |
410(2) |
No.91/CE-II/Misc./
6 |
08.10.96 |
Speed
over Turnout curves. |
|
13. |
910 |
No.97
/CE-II/PRA /3
|
01.7.97 |
Euipment
of level crossing |
|
14. |
804 |
No.98
/CE-II/PRA /7 |
03.6.98 |
Precautions
before commencing operations which would
obstruct the line. |
|
15. |
283(2)
(c) |
No.97
/CE-II/TK /8 |
01.7.98 |
Special
instructios to staff working in Traction
area. |
|
16. |
1122 |
No.98/CE-II/TK/2
/Pt. |
08.9.98 |
Rail
Dolleys. |
|
17. |
1227 |
No.98
/CE-II/PRA / 23/CRS. |
08.9.98 |
Working
of Track Maintenance
Machine. |
|
18. |
275(2) |
No.98
/CE-II/CS /2 |
08.12.98 |
Guard
Rails on Bridges. |
|
19. |
618 |
No.91/Track-III/TM/26
Vol.II (Pt.) |
18.11.98 |
Portable
Accelerometers. |
|
20. |
237
317 |
No.96
/CE-II/PRA / 26/CRS |
16.11.98 |
237
Inspection and Maintenance of points Xing.
317 Renewal of points & Xings. |
|
21. |
202(1) |
No.98
/CE-II/TS /3 |
11.12.98 |
Classification
of Lines. |
|
22. |
238(1)(b) |
No.98
/CE-II/CS /2 |
27.1.99 |
Deep
screening of Ballast. |
|
23. |
211(ii) |
No.98
/CE-II/PRA / 16(CRS) |
10.3.99 |
P.Way
plans and Diagrams. |
|
24. |
302(d) |
No.98
/CE-II/CS /2 |
22.4.99 |
Fcators
Governing P.Way Renewals. |
|
25. |
244(4)(a)
248(2)
305(2)(a) |
No.98/CE-II/TK/Misc./2 |
25.5.99 |
244
Laying of sleepers
248 Standard sections of Rails.
305 Track Standard for Renewals. |
|
26. |
1408
1411 |
No.98/CE-II/TK/Misc./3 |
04.4.99 |
1408
Maintenance of concrete Sleepers.
1411 Maintenance of concrete sleepers Fastening. |
|
27. |
808(3) |
No.94/CE-II/TK/6 |
18.6.99 |
Temp.
Engg. Fixed signals Locations and details. |
|
28. |
252(3) |
No.Track/21/99/0907/7 |
07.9.99 |
Inspection
of Rails in Service. |
|
29. |
618 |
No.91/Track-III/TM/26
Vol.II (Pt.) |
07.7.99 |
Portable
accelerometers. |
|
30. |
202(1) |
No.98
/CE-II/TS /1 Pt. |
07.7.99 |
Classification
of Lines.
|
|
31. |
261
262
263(2)(a) |
No.98/CE-II/TK/Misc./2 |
26.7.99 |
261 Type of Ballast in
use.
262 Size of the Ballast.
263 Ballast profiles/Sections /Depth of
cushions. |
|
32. |
320(1)(a) |
No.98
/CE-II/CS /2 |
04.8.99 |
Classification,use
of released material. |
|
33. |
922
923 |
No.
98/CE-I/ LX /80
|
06.8.99 |
922
Manning of unmanned level crossings
923 Level crossing on National High Ways. |
|
34. |
252(3)
502(4) |
No.
Track / 21/ 99 / 0907 / 7 |
06.8.99 |
252
Inspection of Rails in service.
923 Level crossing on National High Ways. |
|
35. |
901
910(4)(c)
919(2) & (5)
924
925 |
|
19.8.99 |
901 General Location.
910 Equipment at level crossing.
919 Census of Traffic at level xing unmanned/manned.
924 Provision of New level xings.
925 Criteria for replacement of existing
level xings.
|
|
36. |
502
127 |
No.
Track / 21/99 / 0907/7 |
24.8.99 |
502
Alumino Thermit welding of Rails.
127 Quality of welding and avoidable fractures. |
|
37. |
807(2)(b) |
No.98
/CE-II/CS /2 |
01.9.99 |
807
Works of long duration.
808 Temporary Engg. Fixed signals. |
|
38. |
281(c) |
No.
Track /21/99/0907/7 |
08.9.99 |
Glued
insulated Joints. |
|
39. |
244(4)(a)
248(2)(a)
305(2) |
No.97
/CE-II/TS /2Pt.2 |
22.9.99 |
244
Lying of sleepers.
248 Standard section of Rails.
305 Track Standard for Renewals. |
|
40. |
913(3)(a&b) |
No.96
/CE-II/TK /12 |
27.9.99 |
Duties
of Gateman. |
|
41. |
302(a) |
No.98
/CE-II/CS /2pt. |
02.11.99 |
Factors
governing P.way Renewals. |
|
42. |
301
1411(4) |
No.98
/CE-II/CS /2 |
05.11.99 |
301
Classification of Renewals.
1411 Maintenance of concrete sleeper fastening. |
|
43. |
257(4)(d) |
No.
Track / 21/ 99 / 0907 / 7 |
07.1.2000 |
257
Rails failures.
704 Action at site. |
|
44. |
919 |
No.
99/CE-I/ LX /80 |
10.2.2000 |
Census
of traffic at level crossings. |
|
45. |
607 |
No.94/Track-III/TK/23
Vol.II |
17.2.2000 |
Tracks
categories for various parameters. |
|
46. |
202(2)(a) |
No.98
/CE-II/TS /1 Pt. |
06.3.2000 |
Classification
of lines. |
|
47. |
243(4) |
No.99
/CE-II/PRA / Accd./1 |
15.3.2000 |
Buckling of Track. |
|
48. |
1208 |
No.93
/CE-II/PRA / 40 |
11.4.2000 |
Official
incharge of Material Training. |
|
49. |
263 |
No.97/CE-II/Misc./
5(CS) Pt. |
11.4.2000 |
Ballast
profiles/ section,Depth of cusion. |
|
50. |
918 |
No.
99/CE-I/ LX /80
|
13.4.2000 |
Provision
of speed brakers on the approaches of unmanned
L. xing. |
|
51. |
251(5) |
No.98
/CE-II/CS /2 |
21.4.2000 |
Maintenance
of Rail Joints. |
|
52. |
211 |
No.98
/CE-II/TS /4 |
24.2.2000 |
P.Way
Plans and Diagrams. |
|
53. |
203(1)
205
225
228 |
No.88/Track-III/TK/18/
Vol.III Pt. |
24.4.2000 |
203
System of Track maintenance .
205 Maintenance planning.
225 Maintenance by measured showel packing.
228 Directed Track maintenance. |
|
54. |
277 |
No.99
/CE-II/TK /20 |
29.5.2000 |
Inspection
and maintenance of track on approaches of
bridges. |
|
55. |
910(1)(y)&1007(1)
|
No.98
/CE-II/CS /2 |
31.5.2000 |
Equipment
at Level crossing procedure for manual laying. |
|
56. |
252(3) |
No.
Track / 21/99 / 0907/3 |
13.7.2000 |
Ultrasonic
Rail flaw detector. |
|
57. |
202(1) |
No.98
/CE-II/CS /2 |
31.5.2000 |
Classification
of Lines(BG). |
|
58. |
167
168
169
170 |
No.97
/CE-II/TK /15 |
31.7.2000 |
167
Selection and training of keymen.
168 Keyman's daily inspection.
169 Equipment of keyman.
170 Duties of keymen. |
|
59. |
275(3) |
No.2000/CE-I/Misc./10
(IRPWM) |
1.8.2000 |
275
Provision of Guard Rails on Bridges.
723 Pre-monsoon precautionary measures.
724 Material for Emergency. |
|
60. |
237(1)L
242(3)C |
No.98
/CE-II/CS /1 |
7.8.2000 |
237
- Inspection & maintenance of Pts &
crossing.
242-Creep. |
|
61. |
248(2)(a&b)
305(2) |
No.97
/CE-II/TS /2 Pt.2 |
22.8.2000 |
248-Standard
section of Rails.
305-Track standard of renewals. |
|
62. |
1405
1413 |
No.98
/CE-II/CS /2 |
13.9.2000 |
1405
Laying of concrete sleepers.
1413 Laying of Fan shaped turnout sleepers. |
|
63. |
275(3) |
No.98
/CE-II/CS /1 |
27.11.2000 |
275
Fixing of Guard Rails on concrete sleepers. |
|
64. |
901 |
No.
99/CE-I/ LX /80 |
05.1.2001 |
Level
Crossing gateman-901 General location. |
|
65 |
309 |
No.99/CE-II/TK/Misc. |
01.03.2001 |
Project
Report for track renewal works. |
|
66. |
914 |
No.2000
/CE-II/PRA /6 |
30.3.3001 |
Regarding
removal and replacement of check rails of
level crossing during tamping. |
|
67. |
1408 |
No.98/CE-II/TK/Misc./3 |
24.4.2001 |
Maintenance
of concrete sleeper. |
|
68. |
206 |
No.98/CE-II/TS/4 |
25.4.2001 |
Recording
of Gang work - Ann.2/3. |
|
69. |
826 |
No.99/CE-II/PRA/32 |
23.5.2001 |
Safe
working of contractors. |
|
70. |
204
Note (1)
245(e)
301(1)
301(3)
301(4) |
No.98/CE-II/CS/2 |
24.5.2001 |
204 Annual Prog. Of Track Maintenance.
245(e) Wooden Sleepers.
301(1) Classification of Renewals.
301(3) Scattered Renewal.
301(4) Casual Renewal. |
|
71. |
283(2)(C) |
No.97
/CE-II/TK /8 |
17.7.2001 |
No
part of a tree shall be nearer than 4 metres
from the nearest live conductor. |
|
72. |
1411(5)b |
No.98/CE-II/Tk/Min/3 |
08.08.2001 |
In
Service Maintenance. |
|
73. |
1411(5)b |
No.98/CE-II/Tk/Min/3 |
02.11.2001 |
Greasing
of ERC. |
|
74. |
277 |
No.99/CE-II/TK/20 |
26.11.2011 |
Sleepers
and Guard Rails on Bridges. |
|
75 |
913(a)
913(b) |
No.96/CE-II/TK/12 |
05.03.2002 |
|
|
76 |
410
(3)
410 (4) |
No.
2001/CE-II/TK/4 |
16.05.2002 |
Speedover
interlocked turn-outs. |
|
77 |
248
& 322 |
Track/21/93/0503/7 |
12.8.2002 |
Track
structure for different categories of track. |
|
78 |
1408 |
98/Track-III/TK/17/Vol.II |
9.9.2002 |
Picking
up of slacks. |
|
79 |
283
(2)© |
97/CE.II/TK/8 |
10.10.2002 |
The
modalities to be adopted for cutting/trimming
of the trees. |
|
80 |
264 |
98/CE-II/CS/2 |
2.12.02 |
Quantities
of ballast required to recoup the deficiencies. |
|
81 |
914 |
2002/CE-II/PRA/7 |
3.12.02 |
Check
rails of level crossings |
82
|
1122(4)
(iii) |
98/CE-II/TK/2
Pt. Dated 2.2003 |
2.2003 |
Protection
of rail dolley by a flagman |
83
|
606 |
91/Track-III/TM/26/
Vol.III,, dt.25.2.03 |
25.02.2003 |
Frequency
of Track Recording |
84
|
170
& 1411 |
98/CE-II/TK/MISC/3,
dated 8.5.2003 |
8.5.2003 |
Duties
of Keyman |
85
|
256(1) |
2002/CE-II/PRA/9
Pt.(CRS) dated13.5.03 |
13.5.03 |
Permanent
closure rails in running lines |
|
86 |
507(1) |
98/CE-II/TK/MISC/3,
dated 7.7.2003 |
7.7.2003 |
Alignment
- SWR shall not be laid oncurves sharper
than 50 meters. |
|
87 |
170 |
98/CE-II/TK/MISC/3,
dated 25.7.2003 |
25.7.2003 |
Keyman
also to ensure greasing of the ERC. |
|
88 |
259(2) |
99/CE-II/TK/MISC/3,
dated 15.9.2003 |
15.9.2003 |
Rail
maintenance toreduce Rail Deteioration. |
|
89 |
211(1)(v) |
98/CE-II/TK/CS/2,
dated 19.9.2003 |
19.9.2003 |
Permanent
Way Track Diagram |
|
90 |
421 |
2003/CE-II-CS-1 |
23.12.2003 |
Criteria
for realignment of a curve |
|
91 |
252(3) |
Track/21/99/0907/7 |
20.01.2004 |
Ultrasonic
testing of rails |
|
92 |
302(I)(e) |
2003/CE-II/CS-1 |
04.02.2004 |
Rail
renewal on the bridge |
|
93 |
320(3)(5)(8) |
98/CE-II/CS2 |
05.03.2004 |
Corrections
in advance correction slip nos. 32, 44 &
70 |
|
94 |
410(3)
& 410(4) |
|
01.06.2004 |
Speed
over interlocked turnouts |
|
95 |
410 |
2003/CE-II/PRA/17(CRS) |
20.06.2004 |
Methodology
to be adopted by contractors |
|
96 |
607(2) & (3) |
2003/CE-II/PRA/17(CRS) |
22.07.2004 |
Ammendments
to Para 607(2) & (3) |
|
97 |
Para 807 & 808 |
2004/CE-II/CS/1 |
19.10.2004 |
Ammendments
to Annexure 8/3 (Para 807 & 808) |
|
98 |
Para 202 |
2004/CE-II/CS/1 |
17.05.2005 |
Classification
of Lines. |
|
99 |
Para
107, 502, 125, 209 |
2004/CE-II/CS/1 |
12.2005 |
Amendments to para Nos. 107, 212, 502, 125,
209 |
|
100 |
Para 902 |
2003/CE-I/LX/59/ |
21.06.2006 |
Classification of Level Crossings. |
|
101 |
Para 107 |
2004/CE-II/CS/1 |
12.2006 |
Inspection by Trolley. |
102
with
Corri-gendum |
Para 244(2)(e), 273(1),
275(3), 276, 506(3),716 (2) and 1404
|
No. 2006/CE-II/CS/1 |
30.05.2007 |
Advance Correction Slip
No.102 to the Indian Railways Permanent
Way Manual. |
|
103 |
Para 237(6)
|
No. 2007/CE-II/CS/2 |
01.06.2007 |
Advance Correction Slip
No.103 to the Indian Railways Permanent Way
Manual. |
|
104 |
1504 |
No.2007/CE-II/CS/2 |
19.07.2007 |
Advance Correction Slip No.104 to the Indian
Railways Permanent Way manual |
|
105 |
277(a)(3) |
2004/CE-II/CS/ 1 Pt.1 |
22.08.2007 |
Advance Correction Slip No.105 to the Indian
Railways Permanent Way manual |
|
106 |
124(2)(a) |
2006/CE-II/CS/1 |
14.09.2007 |
Advance Correction Slip No.106 to the Indian
Railways Permanent Way manual |
|
107 |
615(3) |
2007/CE-II/CS/2 |
12.11.2007 |
Advance Correction Slip No.107 to the Indian
Railways Permanent Way manual |
|
108 |
1302(2)(h) |
2003/CE-I/LX/59 |
18.12.2007 |
Advance Correction Slip No.108 to the Indian
Railways Permanent Way manual |
|
109 |
202(1) |
2003/CE-II/TS/2 Pt.1 |
.02.2008 |
Advance Correction Slip No.109 to the Indian
Railways Permanent Way manual |
|
110 |
806(1), 806(2) |
2007/CE-II/CS/2 |
04.03.2008 |
Advance Correction Slip No.110 to the Indian
Railways Permanent Way manual |
|
111 |
Paras 222, 701 (2), 1301 (1).
1302 (1), (1) (i), (2) (g), 1307 (1) (g),
1309 (1), 1309 (2), 1309 (4) and Annexures
13/1 (2), (4), (5) & Annexure 13/6 (heading)
|
- |
23.04.2008 |
Advance Correction Slip No.111 to the Indian
Railways Permanent Way manual |
|
112 |
726(3) |
2006/CE-II/CS/1 |
25.4.2008 |
Inspection of all RAW/RAT before the
monsoon. |
|
113 |
1504 |
2006/CE-II/CS/2 |
3.6.2008 |
Refresher courses. |
|
114 |
206(3) and 317(3)(i) |
2006/CE-II/CS |
10.10.2008 |
Gang Chart/diary |
|
115 |
904 & 924(b)(i) |
2006/CE-II/CS/2 |
24.11.2008 |
Manning unmanned level crossings. |
|
116 |
220 |
2008/CE-II/CS/4 |
23.04.2009 |
Trolley Refuges |
|
117 |
322 |
2007/CE-II/CS/2 |
19.05.2009 |
Identification of different qualities of
rails in the field. |
|
118 |
146(vii) |
- |
30.07.2009 |
Supervision of pre and post machine
attention. |
|
119 |
220(3) |
- |
18.08.2009 |
Distance of trolley refuses on bridges. |
|
2. |
INDEX OF ADVANCE CORRECTION SLIPS OF
INDIAN RAILWAYS TRACK
MANUAL |
|
ACS
No. |
Para(s)
affected |
File
No. |
Date
of AC slip |
Brief subject. |
|
37 |
701-E |
2001/CE.I/CT/17(Pt) |
04.03.2003 |
Ammendments
to Para 701-E |
|
38 |
1102-E |
2001/CE.I/CT/17(Pt) |
04.03.2003 |
Ammendments
to Para 1102-E |
|
3. |
INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN
RAILWAYS
TRACK MACHINES MANUAL |
|
ACS
No. |
Para(s)
affected |
File
No. |
Date
of AC slip |
Brief subject. |
|
1 |
8.4.7 |
2000/Track-III/TK/18 |
10.10.2000 |
Ammendments
to Para 8.4.7 |
|
2 |
Para (a) Chapter 8 of IRTMM |
2000/Track-III/TK/18 |
11.07.2002 |
Ammendments
to Para (a) Chapter 8 of IRTMM |
|
3 |
4.6.8 Chapter 4 of IRTMM |
2000/Track-III/TK/18 |
14.05.2003 |
Ammendments
to Para 4.6.8 Chapter 4 of IRTMM |
|
4 |
4.6.8 Chapter 4 of IRTMM |
2000/Track-III/TK/18 |
14.05.2003 |
Ammendments
to Para 4.6.8 Chapter 4 of IRTMM |
|
5 |
5.6 |
2000/Track-III/TK/18 |
15.09.2003 |
Ammendments
to Para 5.6 |
|
6 |
4.3.3 under para 4.3 of Chapter 4 of IRTMM |
2000/Track-III/TK/18 |
13.01.2004 |
Ammendments
to Para 4.3.3 under para 4.3 of Chapter 4 of IRTMM |
|
7 |
4.3.1 under para
4.3 of Chapter 4 of IRTMM |
2000/Track-III/TK/18 |
|
Ammendments to
Para 4.3.3 under para 4.3 of Chapter 4 of
IRTMM |
|
8 |
5.1.3 under para
5.1 at Page 132 of Chapter 5 of IRTMM-2000 |
|
25.10.2004 |
New Paragraph
No.5.1.3 is added under Para No.5.1 at page
132 of Chapter 5 of IRTM-2000 |
|
4. |
INDEX OF ADVANCE CORRECTION SLIPS OF
INDIAN RAILWAYS MANUAL FOR FLASH
BUTT WELDING OF RAILS (1996) |
|
ACS
No. |
Para(s)
affected |
File
No. |
Date
of AC slip |
Brief subject. |
|
7 |
Para
1.1, 5.5, 10.2.1, 10.2.2.1, 13 |
CT/JW/C |
16.01.2007 |
Flash Butt Welding of Rails. |
|
|
5. |
INDEX OF ADVANCE CORRECTION SLIPS OF
INDIAN RAILWAYS MANUAL FOR
ULTRASONIC TESTING OF RAILS AND
WELDS (1998) |
ACS
No. |
Para(s)